Lebanon, IndianaSkjodt Barrett
2024
Manufacturing
341,440 SF
20,000 SF Freezer
This impressive expansion project more than doubles Skjodt Barrett’s manufacturing capacity and includes food-grade components like 5,000 linear feet of under slab, welded, stainless steel process piping and infrastructure for additional packaging lines.
The project also includes a 20,000 square-foot freezer that will provide much needed on-site cold storage space to further streamline Skjodt Barrett’s growing operations.
Dan Skjodt on his experience with Pure Development
“When it comes to sharing of information, clarity, and transparency, it was such an amazing experience. Pure delivered the project on time and 10% under the budget. It’s almost unheard of.”